The Rhondda Fach Active Travel Route (the Route) is a new walking and cycling route between Maerdy and Stanleytown in the Rhondda Fach Valley. The Route will follow the alignment of the former railway line along the valley floor and will include links to local communities, shops, schools and leisure facilities.

The Route has been split into five phases. Phase 1 was completed in January 2024 and Phase 2 was completed in July 2024. Phase 3 and 4 received planning permission in June 2024 and Phase 4 is currently under construction, due to be completed in late Spring 2025.  Phase 5 is due to be constructed from Spring 2026, depending on funding availability. 

Phase 5 of the Route will provide a new shared use route along the former railway line between Maerdy and Tylorstown, with links to Rhondda Fach Sports Centre and Tylorstown Surgery.  It will start at the southern end of Phase 4, which is due to be completed next Spring, and end at Stanleytown overbridge, connecting it to the Porth Relief Road community route.

The consultation documents and supporting material can be found below.

You can also contact us at:

Post - Freepost RUGK-EZZL-ELBH, Consultation Team, Rhondda Cynon Taf County Borough Council, Third Floor Office, 2 Llys Cadwyn, PONTYPRIDD, CF37 4TH

Email  -  ActiveTravelConsultation@rctcbc.gov.uk

All correspondence should be received no later than 16th September 2024.

Reports 

P187-S5-DAS-01

Design and Access Statement

3mb

Drawings 

P187-S5-71-01

Phase 5 – Location Plan and Planning Boundary

2.2mb

P187-S5-71-02 to 04

Phase 5 – General Arrangement

2mb

P187-S5-71-05

Phase 5 – Cross Sections

1.5mb

P187-S5-71-06 to 09

Phase 5 – Drainage Strategy

1.6mb

Supplementary Technical Reports 

 

DRAFT Planning Application Form - Phase 5

0.5mb

WWE24094

Preliminary Arboricultural Impact Assessment

8mb

WWE19003 PEA Rev B

Preliminary Ecological Appraisal

3mb

WWE22181 Rev C

Ecological Impact Assessment

5mb

R Fach 1 V3

Rhondda Fach Strategic NCNC Route 118 Development: Proposed Route

4mb

GC3569-RED-74-ATR-RP-D-0005 P03

Ground Investigation Report (Phases 3, 4 & 5)*

490mb

G24010

Ground Investigation Factual Report Rev1*

82mb

 

* Please note: Due to the file size, this report is only available via email request: ActiveTravelConsultation@rctcbc.gov.uk